In the Spring of 2016 the spillway was replaced, stabilizing the area from further leakage and possible major failure. During the 2016/2017 off-season the two control gates will be replaced. The gates maintain the correct water levels in the canal and without proper function unnecessary man hours are spent manually operating these gates.