The Elite Sod Spillway was completely rebuilt in February 2016. It was found to be leaking and created a possible hazard for a breach of the Main Canal. The open flu was replaced with 160 feet of 6 feet diameter steel pipe.
By srivera|2016-03-24T22:15:09+00:00March 24th, 2016|Projects|Comments Off on Elite Sod Spillway